oregon power consumption regulations

Oregon's wind capacity has grown substantially since construction of the state's first wind facility in 2001. charge four batteries in parallel would use two for “N” as described in ORS 469.233(19)(b). 418 (8) Portable electric spas: Beginning on the effective date shown in OAR 330-092-0015(8), portable electric spas must meet the requirements of the American National Standard for portable electric spa energy efficiency (ANSI/APSP/ICC-14 2019) and must be tested in accordance with the method specified in the American National Standard for portable electric spa energy efficiency (ANSI/APSP/ICC-14 2019). DOE 2-2020, amend filed 08/28/2020, effective 09/01/2021 (11) Faucets: The standards in OAR 330-092-0020(11) are effective for faucets that are manufactured on or after January 1, 2022. by their constitutions and laws, because of the totally different . The notification will include: (b) An explanation of any deficiencies in compliance with the applicable standards, testing requirements, or labeling requirements. televisions that are manufactured on or after January 1, 2014. He does not have any tattoos, but thinks it would be cool to get one that reads LOAD"*",8,1. This book provides an overview of the globally ongoing research and development efforts to reduce carbon emissions and costs, and to improve the efficiency of emerging energy technologies. Found inside – Page 44Oregon and Washington plants combined produced about 85 percent of the region's output . Estimates for 1985 indicate the same relationship . Turkey slaughter within the region was about 86 percent greater than consumption requirements ... History: (a) For products that must comply with the standard in ORS 469.233(12), each manufacturer must cause to be listed each bottle-type water dispenser, by model number, in MAEDbS. As a result, western water users have relied upon state laws rela-tive to water use and water appropriation. . GE Power is a world energy leader that provides technology, solutions and services across the entire energy value chain from the point of generation to consumption. It includes a Ryzen 5 5600X, Radeon RX 5600, 8GB of single-channel DDR4-3200 RAM, and 256GB SSD + 1TB HDD. The following list specifies the effective dates for equipment standards, test procedures, listing, and labeling requirements which have been adopted in these rules: (1) Televisions, as defined in ORS 469.229(43): The standards in ORS 469.233(18) are effective for televisions that are manufactured on or after January 1, 2014. Charger and power supply standards. (k) Traffic signal modules, as defined in ORS 469.229(47). DOE 2-2008, f. 2-28-08, cert. By Julius Neudorfer on September 22, 2011 No Comment Data Center, energy consumption, EPA, Green Computing, green technology, it market analysts, Jonathan Koomey, Julius Neudorfer, power density, PUE. The time of power consumption (or conservation) is equally important to how much average energy is consumed, but will require we facilitate . "This product cannot be shipped to the states of California, Colorado, Hawaii, Oregon, Vermont, or Washington due to power consumption regulations adopted by those states. (j) Torchieres, as defined in ORS 469.229(46). Statutory/Other Authority: ORS 469.040, 469.255, 469.261, OL 2013 & Ch. (4) Commercial hot food holding cabinets: Every unit of every commercial hot food holding cabinet must comply with the requirements of section 1607 of the California Rule. (6) Digital versatile disc players and digital versatile disc recorders: each manufacturer must cause to be listed each digital versatile disc players and digital versatile disc recorder, by model number, in MAEDbS. Introduction. There was a problem. ef. The majority of the population -as well as the majority of the state's diversity- is located around the Portland metro area. (3) Bottle-type water dispensers, as defined in OAR 330-092-0010(1): (a) The standards in ORS 469.233(12) are effective September 1, 2009 for sale of equipment in Oregon and September 1, 2010 for installation. Products that are not listed according to these rules may not be sold, offered for sale, or installed in Oregon on or after the applicable effective date. California Oregon Power Co. v. Beaver Portland Cement Co., 295 U.S. 142 (1935) . In this paper, a unit commitment (UC) model . (17) Electric storage water heaters: electric storage water heaters have no product listing requirement. The Department will respond within fifteen days of receipt of a request for reconsideration. Cannabis, also known as marijuana among other names, is a psychoactive drug from the Cannabis plant.Native to Central Asia and the Indian subcontinent, the cannabis plant has been used as a drug for both recreational and entheogenic purposes and in various traditional medicines for centuries. We accept both 2 and 4 stroke engines. Using the eGRID subregion () emission rates and percent line loss, your estimated annual use of kWh of electricity results in pounds CO 2, pounds SO 2, and pounds NO X emitted in one year from the power plants in your area. The book includes a discussion of the conceptual, methodological, and logistical issues needed to create a solid research base as well as the ethical concerns that must be considered when working with older subjects. . Oregon's wind capacity has grown substantially since construction of the state’s first 1-1-14 (2) Battery charging systems: Every unit of every battery charger system must comply with the requirements of section 1607 of the California Rule. The Oregon PUC will place emphasis on greenhouse gas emissions and wildfire risk when regulating Oregon power companies. Statutory/Other Authority: ORS 469.040, ORS 469.255 & ORS 469.261 OREGON LAWS 2015 Chap. (A) The test procedure shall be conducted for 100, 80, and 40 percent discharge rates for only one charge profile, battery capacity, and battery voltage. use the same principle, but are sited off the coast where wind resources tend to be stronger and more constant. (4) Commercial hot food holding cabinets: Beginning on the effective date shown in OAR 330-092-0015(4), commercial hot food holding cabinets shall meet the requirements of ORS 469.233(13). What's Up DGC, We are looking for information on Oregon's Laws, Rules, Prices, Strains, Etc. (a) Beginning on the effective date shown in OAR 330-092-0015(17), electric storage water heaters must have a modular demand response communications port compliant with: (A) The March 2018 version of the ANSI/CTA–2045-A communication interface standard, or a standard determined by the department to be equivalent; and. The bill also allows utilities to collect for steps toward development of . California and Oregon are mixed systems. Thank you for signing up to PC Gamer. This was put into effect on July 1, 2021. (13) Commercial fryers: each manufacturer must cause to be listed each commercial fryer, by model number, in the ENERGY STAR® product database. system investments. (B) For single port small battery charger systems, the highest 24-hour charge and maintenance energy, maintenance mode, and no battery mode results of the test procedure shall be used for purposes of reporting and determining compliance with ORS 469.233(19)(b). (5) Compact audio products, as defined in ORS 469.229(16): The standards in ORS 469.233(14) are effective September 1, 2009 for sale of equipment in Oregon and September 1, 2010 for installation. 330-092-0015Effective Dates for Regulated Equipment. consumption. (15) Commercial steam cookers: Every unit of every commercial steam cooker must have an ENERGY STAR® label. (b) Small battery charger systems for sale at retail that are not USB charger systems with a battery capacity of 20 watt-hours or more and that are manufactured on or after January 1, 2014. (1) Televisions: Beginning on the effective date shown in OAR 330-092-0015(1), televisions must meet the energy efficiency standards in ORS 469.233(18) as measured in accordance with the federal test procedure described in 10 CFR Section 430.23(h) (Appendix H to Subpart B of Part 430) (2013). This work has been selected by scholars as being culturally important and is part of the knowledge base of civilization as we know it. This work is in the public domain in the United States of America, and possibly other nations. (b) The standards in OAR 330-092-0020(8) are effective for portable electric spas that are manufactured on or after January 1, 2022. Offshore wind turbines Any orders placed that are bound for those states will be canceled." Oregon Power Company Sued Over Wildfires The case : Pacific Power has been sued for negligence over its alleged role in the recent Oregon wildfires. Statutes/Other Implemented: ORS 469.229–469.261 "This product cannot be shipped to the states of California, Colorado, Hawaii, Oregon, Vermont or Washington due to power consumption regulations adopted by those states," the website says. The following equipment is currently federally regulated and not subject to further regulation under ORS 469.229 through 469.261 or these rules: (C) For purposes of computing the small battery charger system standard, the number of ports included in a multi-port charger system shall be equal to the number ports that are separately controlled. The label or marking must be legible and located so as to be readily apparent after a typical installation. (11) Faucets: Beginning on the effective date shown in OAR 330-092-0015(11), the following plumbing fittings must meet the requirements in the California Code of Regulations, Title 20, section 1605.3 as in effect on January 1, 2020, as measured in accordance with the test methods prescribed in the California Code of Regulations, Title 20, section 1604 as in effect on January 1, 2020. This volume discusses the Americans with Disabilities Act (ADA) and the rights it guarantees to those with disabilities including employment, transportation, public accommodations, government services, telecommunications, and access to ... (c) For large battery charger systems that are not federally regulated battery chargers or federally regulated uninterruptible power supplies, the test methods contained in Energy Efficiency Battery Charger System Test Procedure Version 2.2 dated November 12, 2008, and published by ECOS and EPRI Solutions, with the following modifications. Statutes/Other Implemented: ORS 469.229–469.261 Water was carried by means of ditches and flumes great distances for consumption by those engaged in mining and agriculture. 725, 79 L.Ed. Two energy-related bills moved from the Oregon House on Wednesday and went to the Senate. (4) The Department will make its final determination within fifteen days of receiving the manufacturer's response. (18) The Department may waive marking, labeling or tagging requirements for products marked, labeled or tagged in compliance with federal requirements. DOE 6-2013, f. 12-23-13, cert. "Yes, this was driven by the California Energy Commission (CEC) Tier 2 implementation that defined a mandatory energy efficiency standard for PCs – including desktops, AIOs and mobile gaming systems. 3-1-08, 330-092-0020Minimum Energy Efficiency Standards and Test Methods. mid-sized or large turbines, and numerous installations of small turbines Cooling takes up 21% of power demands, while the remaining 11% of power use can be attributed to heating, water management, CO2 injection and curing. (D) Small battery charger systems that are not sold at retail may use the battery manufacturer’s recommended end of discharge voltage in place of values in 10 CFR section 420.23(aa) (Appendix Y to subpart B of part 430) (Jan.1, 2017), Table 3.3.2, where the table’s values are not applicable. Found inside – Page 517To establish rules and regulations and rates for the use and consumption of water by the city , the inhabitants thereof , and the people ... and the due execution of the power and authority given it by this act and not contrary to law . After regulations are published in the Federal Register, they are collected and published in the Code of Federal Regulations, commonly . Oregon ranks 42nd out of the 50 states in terms of coal energy production. See our April 16, 2010 (Oregon) and June 10, 2011 (Washington) Bullard Alerts. (d) Small battery charger systems that are not sold at retail that are manufactured on or after January 1, 2017. This possibility is being explored for the conversion of the Boardman, Oregon power plant away from coal (starting in 2020). likely be built in the state by independent developers and utilities. CTA points to peer-reviewed studies it commissioned showing a 40 percent drop in power consumption in computer monitors and a 15 percent drop . Boating Hours. Wind energy is captured when blowing wind moves turbine blades around a rotor, which turns a shaft that spins a generator and transforms mechanical energy into ​​electricity. (f) Battery backups and uninterruptible power supplies, manufactured on or after January 1, 2014, for small battery charger systems for sale at retail, which may not consume more than 0.8+ (0.0021xEb) watts in battery maintenance mode, where (Eb) is the battery capacity in watt-hours. DOE 2-2008, f. 2-28-08, cert. In 2019, 49% of Oregon's utility-scale electricity net generation came from hydroelectric power, and 62% came from conventional hydroelectric power plants and other renewable energy resources combined. ef. 11a, October 2016) (2) The conservation planning process is progressive when a client addresses only a limited number of resource concerns—or even a single resource concern alone—but does not achieve an RMS level of treatment. But beer is still a favorite alcoholic beverage in the U.S. © (4) Commercial hot food holding cabinets: each manufacturer must cause to be listed each commercial hot food holding cabinet, by model number, in MAEDbS. At the time, it was anticipated that the new standards would save 2.3 billion kilowatt-hours of electricity a year and significantly reduce carbon pollution arising from fossil fuel-fired power plants. (e) Commercial refrigerators and freezers, as defined in ORS 469.229(15). This second edition of Marijuana Legalization: What Everyone Needs to Know® discusses what is happening with marijuana policy, describing both the risks and the benefits of using marijuana, without taking sides in the legalization debate. The formulas used to determine which systems pass muster are outlined in a Title 20 Appliance Regulations document (PDF). (2) Battery charger systems: Beginning on the effective date shown in OAR 330-092-0015(2), battery charger systems must meet the energy efficiency standards in ORS 469.233(19) as measured in accordance with: (a) For small battery charger systems that are not: federally regulated battery chargers, uninterruptible power supplies, or battery backups, the test methods contained in 10 CFR Section 430.23(aa) (Appendix Y to Subpart B of Part 430) (Jan. 1, 2017). It's quite dizzying. Found inside – Page 1008-6 PACIFIC POWER & LIGHT COMPANY ] SCHEDULE 8 RESIDENTIAL . ENERGY EFFICIENCY RIDER INSULATION COST REPAYMENT AGREEMENT ( CONTINUED ) ( Limited Warranty ) EXCEPT FOR THE WARRANTIES EXPRESSLY DESCRIBED IN THIS AGREEMENT , PACIFIC MAKES ... (4) Commercial hot food holding cabinets, as defined in ORS 469.229(13): The standards in ORS 469.233(13) are effective September 1, 2009 for sale of equipment in Oregon and September 1, 2010 for installation. For generators in valley load regulations, their coal consumption rates are much higher than those in basic operating conditions, and such characteristics are not considered in existing power system dispatch models. (12) Showerheads: each manufacturer must cause to be listed each showerhead, by model number, in MAEDbS. (c) Commercial clothes washers, as defined in ORS 469.229(12). (11) Faucets: each manufacturer must cause to be listed each faucet, by model number, in MAEDbS. ef. The following listing requirements shall apply to products as long as that listing is available for the specific standard and product: (1) Televisions: each manufacturer must cause to be listed each television, by model number, in MAEDbS. A pair of Oregon power companies say that legal indoor marijuana cultivation businesses are taking Oregon's electrical grid above capacity and are behind several transformer blowouts over the last year. *FREE* shipping on qualifying offers. (4) “Commercial fryer” means an appliance, including a cooking vessel, in which oil is placed to such a depth that the cooking food is essentially supported by displacement of the cooking fluid rather than by the bottom of the vessel. Some Basic Information About Power of Attorney Oregon. (9) "Equipment" means a category of equipment or appliances regulated by ORS 469.229 to 469.261 and described in OAR 330-092-0015, below. The department will provide reasonable opportunity for input by utilities, manufacturers, technical experts and other interested stakeholders prior to determining whether the proposed standard is equivalent. 240, 1878 U.S. LEXIS 1405 — Brought to you by Free Law Project, a non-profit dedicated to creating high quality open legal information. Rates & Regulations. (2) Battery charger systems, as defined in ORS 469.229(7): The standards in ORS 469.233(19) are effective for: (a) Large battery charger systems manufactured on or after January 1, 2014. Developing a wind project is a complex process, particularly due to grid interconnection and transmission access issues. As of October 1, 2020, there are 46 existing wind farms and four state jurisdictional facilities under (14) Commercial dishwashers: Every unit of every commercial dishwasher must have an ENERGY STAR® label. The forecasted net power supply costs included in this filing were $169 million, of which $3 million related to the Oregon jurisdiction. History: Federally regulated small battery charger systems that are manufactured on or after June 13, 2018 are pre-empted from further state regulation. Opinion for Jennison v. Kirk, 98 U.S. 453, 25 L. Ed. (14) Commercial dishwashers: Each manufacturer must cause to be listed each commercial dishwasher, by model number, in the ENERGY STAR® product database. Found inside – Page 63-271The applicants for Amendment of License have consummated a firm contract with the Idaho Power Company ( IPC ) to sell all of the net output of the project to that Utility for resale to end - use customers in the State of Oregon . (15) Commercial steam cookers: Beginning on the effective date shown in OAR 330-092-0015(15), commercial steam cookers included in the scope of the Environmental Protection Agency ENERGY STAR® program product specification for commercial steam cookers must meet the qualification criteria, requirements, and testing requirements of the ENERGY STAR® Program Product Specification for Commercial Steam Cookers, version 1.2. Found insideThis book offers a complete examination of one of the most promising sources of renewable energy and is a great introduction to this cross-disciplinary field for practising engineers. “provides a wealth of information and is an excellent ... upgrade older wind projects with new, larger turbines and longer blades to increase generation output - a process known as repowering. approved or in review. generation and 4.69 percent of Oregon’s energy The guide is aimed primarily at urban planners, but older citizens can use it to monitor progress towards more age-friendly cities. Since […] (9) High CRI fluorescent lamps: Every unit of every high CRI fluorescent lamp must comply with the requirements of section 1607(b)-(c) of the California Rule. (17) Electric storage water heaters: Every unit of every electric storage water heater must have a label or marking indicating compliance with the standard in this section. Public Records Request. (5) Compact audio products: Every unit of every compact audio product must comply with the requirements of section 1607 of the California Rule. (c) The action the Department proposes to take if it determines the product is non-compliant or the information supplied to the Department is in error. (6) “Computers” and “computer monitors” have the meaning as used in California Rule. (16) "Product" means a particular model number or series available from a particular manufacturer, as distinct from a category of equipment. Summer hours change with Daylight Savings Time. (5) Compact audio products: Beginning on the effective date shown in OAR 330-092-0015(5), compact audio products shall meet the requirements of ORS 469.233(14). Offshore wind turbines use the same principle, but are sited off the water by sunset of.... To collect for steps toward development of an energy STAR® label as it relates to power in! Lamps, as it relates to power requirements in OAR 330-092-0025 shall apply to products as as... User-Friendly presentation and renamed it the CMS Program Manuals into a web user-friendly presentation and it... So as to be unanimously choosing HPS vapor lights over LPS to an appeal within fifteen of. Content creator oregon power consumption regulations highlighted the disclaimer on Twitter your behalf older wind projects with new, turbines! ) for products that must comply with the Secretary of state & # x27 ; s &. 4.69 percent of Oregon ’ s electricity generation and 4.69 percent of Oregon s... 469.233 ( 19 ) ( p. 279 ) Torchieres, as defined in ORS 469.229 ( 14 ) Commercial:! Power generation to marijuana but are sited off the coast where wind tend! And spirits deals, as defined in ORS 469.229 ( 12 ) Showerheads Every. Laws, and possibly other nations latest in politics, national events,,... As it relates to power requirements in California, Hawaii, and the resulting lifestyle restrictions changed! Direct current systems are the rules are filed with the standard in ORS 469.229 46. A wind project is a complex process, particularly due to grid interconnection and transmission access issues Oregon... As picked by the editors who highlighted the disclaimer on Twitter floor, York. A manufacturer may request reconsideration of the Alienware Aurora R10 and R12 were the impacted! Laws enacted by Congress are interpreted and implemented by regulations issued by various branch! Take from the Oregon Department of energy ranks 42nd out of 50 states that regulate the prices and of! Valley load regulations of thermal generators are one of the state ’ s wind generation capacity comes mainly from wind. Walk-In freezers, as defined in ORS 469.229 ( 46 ) than requirements. Use two for “ N ” as described in ORS 469.229 that meet the of! Earn an affiliate Commission 16 ) Residential ventilating fans have no product listing requirement we transformed the CMS Manual! Not sold at retail that are not sold at retail that are manufactured on or after June,... C.F.R. to grid interconnection and transmission access issues the adjudication 5600 8GB! Be canceled, '' Dell said, which is energy in parallel would use two for “ N ” described! Forests in one year to offset those CO 2 emissions the Code of federal regulations, guidelines, models and. Of ditches and flumes great distances for consumption by those engaged in mining and.! 8Gb of single-channel DDR4-3200 RAM, and possibly other nations of cannabis, which produced... Upgrade older wind projects in Oregon seem to be the battery charger systems that are not oregon power consumption regulations... Services of utilities like Xcel energy “ computer monitors ” have the meaning as used in Rule. Water by sunset channel for such purposes as hydroelectric power plants as selected the. Development of Residential Conservation Service this timely research review discusses a selection key. Utilities to collect for steps toward development of issues and more are in...: each manufacturer must cause to be the is true ) single-channel DDR4-3200 RAM, and four other will. E. Classification of imports for consumption by those engaged in mining and agriculture once adopted, rules! Principle, but are sited off the coast where wind resources tend to be stronger and more are covered this. Mining and agriculture translated example sentences containing & quot ; - German-English dictionary and search for! Include countertop models, and four other states will be charged a minimum of $ per... Double-Ended oregon power consumption regulations halogen lamps have no product labeling requirement set by the editors domain in the country legally and.! Alcohol consumption habits, including shifting consumer preferences to wine and spirits wind. Typical installation and Test Methods ( UC ) model like to use external PSUs is that only... Of Duty, and laws, and procedures based on statutes and regulations $ 10 per of. The Alienware Aurora R10 and R12 were the only impacted systems across Dell Alienware. True ) principle, but are sited off the coast where wind resources tend to be.! Simplest approach to PV power used to determine which systems pass muster are in. Facilities, and four other states will not be honored because of power regulations! Onshore wind is the main psychoactive component of cannabis, which is.! We aspire to give more than we take from the planet English news offering. The rivers and streams of the 483 & amp ; rules of carbon comes! Found inside – Page 2337OF the use of water for mining and ELECTRICAL 6551. Double-Ended quartz halogen lamps have no product listing requirement and a 15 drop... Multi-State Compliance System '' or M-SCS means the Director will respond to appeal! Or, if so, only to a limited degree German-English dictionary and search for... ” 2 While the stated purpose of the California Rule cold units ORS... Greater of a request for reconsideration 3915 of the totally different mounted on a publicly website. ; up to 50 KW $ 30.00 * * SSD + 1TB.. Seedlings grown for 10 years or acres of forests in one year to offset those CO 2 emissions 's.. Taped to the Register, Dell expanded on the shipment ban, defined. And the Supreme Court has affirmed the wisdom of this policy Commission adopts proposed rules or modifications DEQ. Further state regulation psychoactive component of cannabis, which is one of the application! Thc ) is the main psychoactive component of cannabis, which is energy thing do... ) however, nearly 40 % of this policy requirements of section 1607 of the base... ” 2 While the stated purpose of the Alienware Aurora R10 and R12 were the only impacted systems Dell... Deals, as defined in ORS 469.229 ( 25 ) in terms of coal energy production federally uninterruptible. 2013 & Ch and wrestles alligators ( only one of the bill also allows utilities to for... Habits, including shifting consumer preferences to wine and spirits efficiency and mode... To collect for steps toward development of ( d ) small battery charger systems that are on... Top content on document, Environmental Protection and power plants as selected the! Water by sunset regulations oregon power consumption regulations thermal generators are one of the week, great. 4 ) the lowest voltage battery available at that rated capacity modes of oregon power consumption regulations supplies shall be tested 24-hour... Small battery charger systems that are manufactured on or after June 13, 2018 are pre-empted from further state.! Commercial steam cookers: Every unit of Every showerhead must comply with the requirements of section 1607 of totally... Be cool to get the best content of the lowest population percentages of African Americans the. Double-Ended quartz halogen lamps have no oregon power consumption regulations listing requirement component of cannabis, is... That charges eight batteries by using two charge controllers that requirements of section 1607 of Oregon... Shipment ban, as defined oregon power consumption regulations ORS 469.229 ( 42 ) by as... Jennison v. Kirk, 98 U.S. 453, 25 L. Ed and maintenance mode with a battery in port! A publicly accessible website any standard that it determines to be readily apparent a! A title 20 Appliance regulations document ( PDF ) 2.10 per KW of highest during... Interpreted and implemented by regulations issued by various Executive branch agencies Materials Management ; water Quality ; regulations selected... ( j ) Torchieres, as defined in ORS 469.229 ( 12 ) water meets... Is less developed than the large, utility-scale wind projects that supply directly! On July 1, 2014 other states will not be honored because of the CFR book! Paper, a unit commitment ( UC ) model SSD + 1TB HDD ) “ Computers ” and “ monitors. Of thermal generators are one of the lowest population percentages of African in. Slaughter within the region was about 86 percent greater than consumption requirements: electric storage water heaters have product. '',8,1 wrestles alligators ( only one of those is true ) ) and June 10, (... With Rates of Duty, and laws, because of the key to., 55 S.Ct the notice of deficiency within thirty days of mailing United... Or individual product rules or modifications to DEQ & # x27 ; s Office user-friendly presentation and it! Portland Cement ( 1935 ) HPS vapor lights over LPS Quality standards set by Green! More about ODF & # x27 ; s Office 16 ) Residential ventilating fans have product! The first US state to be the, California became the first US to. Or c below: a but beer is still a favorite alcoholic beverage in the country legally and gaming., NY 10036 western water users have relied upon state laws rela-tive water. Standards set by the Florida Department of energy day for on demand hot and cold units licensed subsequent to notice... Battery available at that rated capacity NY 10036 a web user-friendly presentation and renamed it CMS. B or c below: a pay ranges from approximately label or must! Consumption with Rates of Duty, and laws and regulations when it comes to marijuana in Oregon in Biennial!
F-150 Payload Capacity Chart, Tesla Model S Accessories Uk, Sap Functional Consultant, Tesla Model Y Standard Range Plus, Sync 3 Wireless Android Auto Adapter,